Customization: | Available |
---|---|
After-sales Service: | Online |
Warranty: | 18months |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Procedure |
Prepared Cars/Metal Sheet Disassemble-Puttying-surface coating---Putty Polishing---putty polishing-Clean and Cover-Surface Coating-Baking-Polish-Assembly |
Station Number | According to customer's needed. |
Optional Equipments | Infrared lamp (For Sanding Middle Coat and Primer Paint station) Ceiling Movable Pulley Infrared Lamp (For baking station) |
Optional Quantity of equipment |
Sanders with dust extraction 1 set, Spray Gun 2 sets, Air compressor 1 sets, equipped the air tube, other tools etc. The power supply and concrete foundation prepared by the buyer, the supplier provide the drawing of foundation. |
Estimated Procedure Finish Time | Bottleneck Station is Surface Coating, about 30 min, output 15-20 cars per day and 10 work hours a day. |
Paint booth (left booth) | ||
Cabin system | 1.Wall board : EPS colorful steel skin panel , 50mm thick, tongue & groove style ,compound construction . Anti-flame and heat-insulation, galvanized steel roof panel .Upper body size: 450mm |
|
2. Basement :350mm thick, galvanized steel sheet and square steel pipe assembling, corrosion-resistant steel square pipe assembly,configure two road grille and three diamond plate.two embossed steel ramps. |
||
high-strength steel . The strength of the bolt is: 12 level . |
||
Circulation system oblique-flow |
Intake system : One set 7.5kw direct-drive inlet fan. Outlet system : One set 7.5kw direct-drive inlet fan. |
|
Water-born paint system | Dry air blower for waterborn paint fan : 2.2kw /set * 2set |
|
Light ting system |
Lighting : 8 group *4pcs total 32pcs Omron brand lamp. External type installation ,simpler and easier installation of maintenance. With explosion -proof , IP Grade: IP65. |
|
Purification system | Inlet air filter is made of high-quality filter cotton, effectively capture greater than 10um , top filtering for Italian high into the VI filter cotton, effectively capture greater the 5um dust particles. To filter for glass fiber cotton . |
|
Middle door -manual folder door | ||
Baking booth (right door ) | ||
Cabin system | 1.Wall board :EPS colorful steel skin panel , 50mm thick, tongue & groove style ,compound construction Anti-flame and heat-insulation, galvanized steel roof panel .Upper body size: 450mm |
|
|
||
3. Exit Door : 3200*2700mm , Entrance door :1set (3pcs) Material : steel plate + rock wool .door hinge adopt high-strength steel . The strength of the bolt is: 12 level . |
||
Heating system | Burner plates for Italy Noue, G20- maximum calorific value as 18 000kcal . Exchange used S US304 high-quality stainless steel argon arc welding 10-Newton for Switzerland imported electric actuator, spray paint automatic switching . Max. Temperature: 80 ºC, heating rage: 4-6min(20-60 ºC ). Fuel consumption : 4-6kg/set |
|
Circulation system | Intake system : One set 7.5kw direct-drive inlet fan. | |
Light ting system | Lighting : 8 group *4pcs total 32pcs Omron brand lamp. External type installation ,simpler and easier installation of maintenance. With explosion -proof , IP Grade: IP65. |
|
Control system | Siemens electrical components : the main circuit is equipped with multiple protection . Equipped with light switch ,temperature, time settings, painting, spray paint, paint up thermostat gateway .fault alarm ect. |
|
Purification system | Inlet air filter is made of high-quality filter cotton, effectively capture greater than 10um , top filtering for Italian high into the VI filter cotton, effectively capture greater the 5um dust particles. To filter for glass fiber cotton . |